Compare backup-power quotes beyond the equipment price
A practical worksheet for spotting different scopes, exclusions and service responsibilities before choosing an installed system.

Give each provider the same brief
Start with what you want to keep working and the interruption you are planning for. If one provider is quoting a handful of essential loads and another is proposing a much larger system, comparing their totals alone will not tell you much.
Use the same initial brief for each conversation. If a provider suggests changing it, record the reason and the resulting differences. That suggestion may be useful; it should also be visible when you compare proposals.

Separate the equipment from the work around it
Ask each provider to mark the following as included, excluded, an allowance or not applicable. This is our suggested comparison framework, not a universal list of required work.
- Exact equipment models, quantities and supporting components.
- Property assessment, design and required approvals.
- Site preparation, delivery and access.
- Electrical work and any other utility connections.
- Testing, handover and operating instructions.
- Restoring disturbed areas and removing project waste.
- Taxes, recurring charges and ongoing service.
Generac’s installation overview (opens in a new tab) illustrates why siting, fuel connections and installation preparation belong in the discussion. It is a manufacturer’s description of its process, not a guarantee about another provider’s quote.
Make unknowns visible
An allowance is not the same as a settled price. Ask what will determine the final amount, who will assess it and when you will know. If a proposal says that something is “by others,” identify who those others are and whether you need a separate quote.
Consider this hypothetical comparison: one proposal includes restoring the disturbed area, while another leaves that work to the homeowner. Neither is automatically the better choice. You need to decide whether you want to arrange the extra work and include it in your comparison.
Ask how changes to scope will be documented and agreed before additional work proceeds. Keep the written answers with the proposal.
| Item to clarify | Proposal A: status and amount | Proposal B: status and amount | Who will answer, and when? |
|---|---|---|---|
| Covered loads and duration assumptions | ____________ | ____________ | ____________ |
| Equipment and supporting components | ____________ | ____________ | ____________ |
| Site work and approvals | ____________ | ____________ | ____________ |
| Electrical and utility work | ____________ | ____________ | ____________ |
| Testing and handover | ____________ | ____________ | ____________ |
| Restoration and removal | ____________ | ____________ | ____________ |
| Service and recurring costs | ____________ | ____________ | ____________ |
INCLUDED
In the stated scope
Record the exact work or equipment covered.
EXCLUDED
A separate responsibility
Name who arranges it and request its cost.
ALLOWANCE
A provisional amount
Ask what changes the final amount and when it will be settled.
UNRESOLVED
An answer is missing
Request written clarification before comparing totals.
Compare the promised result and the handover
Ask the provider to describe what the completed system should do for your listed loads, which assumptions support that description, and how they will demonstrate operation at handover. Keep equipment capacity, expected duration and covered loads as separate questions.
Then ask who provides operating instructions, handles service calls and explains the maintenance schedule. Equipment warranty, installation workmanship and an ongoing service agreement may be separate documents. Ask for each applicable document and the exclusions before making a decision.
Choose what to clarify next
You do not need to decide during the first conversation. Mark each unanswered item and send the provider a short list of questions. Have a qualified professional explain any technical difference you cannot evaluate yourself, and check the provider’s credentials with the appropriate local authority.
Your next step: enter two proposals in the planner, then circle the three differences that could change your decision. The aim is a clear scope you understand, not simply the lowest equipment price.